Recent Onshore Projects

Guidon Energy:
Air Strip CDP

This central processing facility includes two 3516 TALE Ariel/CAT compressor with separation, dehydration, and metering for sales gas pipeline. Strategy’s scope included full turnkey of this facility, including design and supply of skidded and equipment and pipe rack, and construction management.

gas compression
gas compression pipelines

Navitas Midstream:
Standardized Compressor Station

Detailed design, procurement, and skid fabrication of standard up to 35 MMSCFD compressor stations with modular skidded equipment. Facility included up to three x 3516 compressor packages with dehydration, BTEX, and NGL reinjection. Scope included project management, engineering, design and drafting, construction management, commissioning, and start-up.

Noble Energy:
Gates 16 CDP

Strategy provided the engineering and design services for their Gates CDP 16 located in Webb County, TX on their Gates Ranch asset. The CDP was designed for 200 MMSCFD, 12,000 BPD of condensate and 4,000 BPD of water and designed to facilitate a 7:1 turn down to handle the varying required flow conditions through out the lifecycle of the facility. The site gathers and processes local production for Noble Energy’s Gates Ranch asset and includes 12,000 BPD of condensate stabilization and 70 MMSCFD of gas compression.

oil processing
electrical control panel

Occidental Corporation:
West TX and NM Arc Flash Program

Strategy is currently completing the arc flash program for over 400 well sites and batteries in the West Texas and New Mexico areas, as well as the Terrel and Indian gas processing plants. Our scope included field data gathering, creating one-line diagrams, area classifications, GPS coordinates, Maximo implementation, and each arc flash report generated in ETAP.

Summit Midstream:
Severus and Blossom Compressor Stations

Summit Midstream’s Severus and Blossom compressor stations are two greenfield projects located the Permian Basin. Strategy performed the engineering, design, and procurement services for both 30 MMSCFD compressor stations. The packaged equipment and pipe racks were based off Strategy’s standard designs.

gas processing
onshore pipeline construction

American Midstream:
Silver Dollar Pipeline Extension

Phase 1 – Installed 11.92 miles of 10-inch pipeline and oil transfer system tied into a new production facility delivering to the SDP system. Phase 2 – Installed 9.1 miles of 10-inch pipeline and oil transfer system tied into new production facility delivering to the SDP system. Installed 1.45 miles of 3-phase electric power from Oncor to power oil transfer equipment at one of the three locations.