Recent Offshore Projects
American Midstream:
VK-817A Compression
Strategy was responsible for the project management, detailed engineering (mechanical, electrical, instrumentation, structural), full 3D laser scan of VK-817A, drafting/ design through construction management offshore. The equipment addition included two (2) Solar Turbine / Centaur 50-6200L, inlet scrubber, inlet filter/separator and all associated piping.


Arena Energy:
HI-A547C Platform
Provided structural, facility, and pipeline engineering for the installation of a four pile well protector platform in 253 ft. of water, tied back to an existing platform. The platform will support up to twelve wells and included a main deck, cellar deck, wellhead access deck, sump deck, and helideck.

Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Arena Energy:
ST-131K Platform
Provided structural, facility, and pipeline engineering for the installation of a four pile well protector platform in 153 ft. of water, tied back to an existing platform. The platform will support up to twelve wells and included a main deck, cellar deck, wellhead access deck, sump deck, and helideck.


Talos Energy:
GC-237B Tornado Tieback Facility Upgrade
Strategy provided the engineering, design, procurement and construction management of the topsides modifications to HP1 FPSO (GC-237B) for parallel meter additions (gas, oil and water) and additional path for P1 riser to allocation separators “A” and “B”.
Castex Offshore:
Oyster Bayou Engineering Assessment
This project consisted of a site visit to the unmanned production barge in Four League Bay to walkdown MFDs, equipment layout, safety systems, electrical equipment and obtain instrument information critical to facility capacity study (i.e. relief valves, control valves, meters). Strategy performed a complete engineering review of the vessels, piping, and systems that are presently on the production facility, confirmed vessel and equipment capacities, safety system review of MFDs, SAFE charts, checked for any NFPA 70 – NEC code violations, reported any safety concerns, developed a load list with the data gathered and provided an engineering review summary report.